Toll Free Phone Number   866-921-2628
counter
270-866-2628 
Paul@woodiesrestorations.com
1956 Lyman
12/18/17
We now have the engine set in the boat. The next step is to install the shaft, then wire and plumb the engine.
<< Page 1
2
12/29/17
We now have the shaft log, shaft and strut installed. We have installed the cradle for the fuel tank and soon will have the new fuel tank installed in the boat.
01/04/18
The reassembly is coming right along. We now have the flooring and both front and back seat frames in the boat.
05/25/18