Toll Free Phone Number   866-921-2628
counter
270-343-2628 
Paul@woodiesrestorations.com
1996 HackerCraft
11/25/2020
12/4/2020
12/11/2020
1/22/2021
5/6/2021
5/14/2021
6/29/2021
7/1/2021
7/19/2021
8/20/2021
9/10/2021
The boat has now been flipped back to the upright position and the sides and transom have been stripped and faired.
9/14/2021
Now that the boat is right side up we have started the process of stripping the varnish from the decks.
9/20/2021
A lot happened very quickly. The boat has now been sanded, stained and then multiple coats of sealer have been applied.
10/13/2021
We are half way there. We now have six coats of varnish on the boat. We will do a white out sanding then start the next round of varnish.
2/11/2022
All of the build up coats and gold leaf graphics are finished. Now we will do a final sanding and then the final coat of varnish.
6/27/2022
The end is in sight! Watch the video above to hear more details from Paul.
Completed Work 6/29/22