The sides will be painted along with varnish work the decks.
12/18/14
The motor cover is getting reupholstered.
1/9/15
Rot was removed and the hole repaired
The old dowells were removed and replaced with the proper face grain plugs (commonly called bungs).
1/16/15
The decks have been bleached.
1/15/15
Battnen is being installed under the rear deck.
Another spot with small holes will need to be repaired.
1/23/15
The decks have been sanded and bleached.
The decks have had a second coat of bleach.
1/26/15
< The batten on the inside.
The angle at the back of the plank made a sharp edge at the AFT bottom corner. That edge had broke away in places. We cleaned out the seam to make it look more uniform and like it was suppose to be there. The AFT deck was covered from the Ownes Factory.
The finished and installed batten.
The decks are receiving stain.
The decks have been stained.
1/27/15
The decks are being sealed.
2/10/15
The first coat of varnish has been applied.
2/12/15
The second coat of varnish has been applied.
2/18/15
The fifth coat of varnish has been applied.
2/27/15
Another coat of build up varnish is being applied. The deck lines have also been applied.
3/3/15
The third coat of build up varnish has been applied.