1956 Chris Craft Special Sportsman
9/15/14
The decks will be stripped and refinished. 
10/14/14
The decks have been stripped and the rails removed.
The rails have been fabricated. 
10/17/14
10/23/14
Bungs have been installed ad sanded flat on the port and starboard side deck planks.
10/24/14
The decks are being bleached so they are the same color and the stain will be even. 
10/28/14
The decks have been bleached and are being sanded to smooth out cross grain scratches. 
10/29/14
The first coat of stain has been applied. 
11/03/14
The rear deck plane has been fabricated and is being faired down. 
11/05/14
The rear deck screw holes have had bungs installed with epoxy. 
11/06/14
The rear deck and the bungs have been sanded down flat. 
11/06/14
The first coat of stain has been put on. 
Sealer has been put on the boat. 
11/14/14
Bungs have been installed. 
11/19/14
11/24/14
The cap rails have been stained and sealed.
12/01/14
The top decks received varnish. 
12/04/14
A second coat of varnish has been applied. 
12/10/14
The top decks are close to matching the side decks. 
12/17/14
Another coat of varnish has been applied to the decks. 
12/19/14
The decks in sunlight. 
1/5/15
The decks are in the process of being stained darker. 
1/7/15
The decks have received a coat of varnish. 
1/13/15
The decks have been sanded and the boat washed.  
1/14/15
The final coat of varnish has been applied. 
1/20/15
The varnish work is complete.
1/20/15
The steering wheel has been removed and in the sanding process. 
3/3/15
The deck lines have been painted. The winch handle is too long. 
3/3/15
The steering wheel is being painted. The black is applied and wet sanded to help find low spots in the white paint. 
3/13/15
The boat is complete and ready for transport!