Toll Free Phone Number   866-921-2628
counter
270-343-2628 
Paul@woodiesrestorations.com
1955 Chris Craft Capri
11/14/19
In the picture above to the left you can see we repaired a small section of rot. We cut out all of the rot down to good wood and epoxied a new piece of mahogany. Then we trimmed and sanded to make the new piece match and coated with CPES, which stands for clear penetrating epoxy sealer. This will create a protective barrier over the wood. You can also see in the picture to the right we have removed another side plank and a section of batten. We will now fabricate new planks and a new section of batten. 
11/21/19
We now have the new section of batten installed. We also have the plank second from the top dry fit to the boat and are currently shaping the top plank. Once we are done shaping the top plank we can dry fit everything together before we permanently install.